This is the approach we use. It works whether your council has adopted a Plan Strategy or still relies on the older regional policies.
Step 1: Confirm the council and its stage
Start by confirming which council covers the site; our article on which council decides your application explains the boundary traps. Then check the council’s stage:
- Plan Strategy adopted: the council’s own operational policies apply, and the regional Planning Policy Statements do not.
- No adopted Plan Strategy: the Strategic Planning Policy Statement and the retained PPSs apply, with any draft Plan Strategy as a material consideration only.
Our development plan status table shows where each council stood in November 2026.
Step 2: Find the area plan map
Whatever the council’s stage, settlement limits, zonings and many designations still come from the older departmental area plan, because no council has yet adopted a Local Policies Plan. Find the map for your area, which may be on the council’s website or the Department for Infrastructure’s departmental development plans pages, and locate the site.
Ask yourself:
- Is the site inside a settlement limit (a city, town, village or smaller settlement) or in the countryside?
- Is it zoned for a particular use, such as housing, industry or open space?
- Is it within a designation, such as a conservation area, an area of townscape character, a local landscape policy area, a green belt or countryside policy area in older plans, or an area of outstanding natural beauty?
The answer to the first question shapes everything. A plot outside the settlement limit is treated as countryside, however built up it looks.
Step 3: Identify the policies that decide your type of project
Development plans contain dozens of policies, but only a handful will matter for a given project:
- An extension: the residential extensions policy, such as EXT 1 of the PPS 7 addendum, or the council equivalent (RD2 in Belfast, DM 22 in Antrim and Newtownabbey, HOU 10 in Derry City and Strabane, HOU3 in Mid and East Antrim).
- A countryside house: the rural housing suite, which is PPS 21 in five councils and the council’s own policies in the other six.
- A change of use: the policies for the relevant land use and location, and any HMO or short-term let policy.
- A business: economic development and countryside policies, and town-centre or retail policies where relevant.
Then add the cross-cutting policies that apply to almost everything: design, amenity, access and parking, flood risk, natural heritage and built heritage.
Step 4: Read the policy box and the justification
In most plans, each policy has a box containing the policy itself, followed by “justification and amplification” text. The box sets the tests. The justification explains how the council will interpret them and often lists the evidence it expects. For example, a farm-dwelling policy box may require an active and established business, while the justification explains what records count as evidence.
Make a simple checklist of every test in the policy and note how your proposal meets each one.
Step 5: Check supplementary guidance
Councils and the Department publish supplementary guidance that sits beneath the policies, such as design guides, parking standards and the rural design guide Building on Tradition, which remains a useful official reference. Some councils also have specific guidance on HMOs, short-term lets or particular areas.
Step 6: Look at recent decisions nearby
The public planning register shows how the council has applied its policies. Look for recent decisions on similar proposals in the area, and read the case officer reports where available. Be careful: a decision made under PPS 21 before a Plan Strategy was adopted may not be a reliable guide to the new policy.
Step 7: Check the draft plan, if there is one
In councils without an adopted Plan Strategy, look at the draft to see whether the direction of policy is changing. A draft carries limited weight, but if it would treat your site very differently, it may affect your timing.
Common mistakes
- Relying on advice written for England, where the system and terminology are different.
- Assuming PPS 21 applies everywhere. It no longer does.
- Ignoring the area plan because the council has a new Plan Strategy.
- Reading the policy box without the justification.
- Missing a designation because the map was not checked at a large enough scale.
Then design
Once you know the tests, the design can respond to them: siting a rural house to use existing hedges for enclosure, stepping an extension back from a boundary, or choosing a use that fits the zoning. That is far cheaper than redesigning after a refusal. If you would like help, our council pages are a good starting point, or call us for a free first view.