At a glance
- Plan Strategy: draft published September 2025; consultation re-run from 16 January to 16 March 2026. Not adopted.
- Policies in force: the SPPS and the retained regional PPSs, including PPS 21 for countryside houses and the PPS 7 addendum for extensions.
- Area plans: the North Down and Ards Area Plan 1984–1995 and the Ards and Down Area Plan 2015, with draft BMAP a material consideration for the north of the borough.
- How to apply: the NI Planning Portal.
- Designations: conservation areas at Donaghadee, Holywood and Portaferry; part of the Strangford and Lecale AONB.
Where the local development plan stands
The council published its draft Plan Strategy in September 2025. Because one public notice appeared a week late, it re-ran the consultation from 16 January 2026 for eight weeks, closing on 16 March 2026, and asked everyone to resubmit. The next stages are independent examination and a binding report from DfI, so adoption is still some way off. Until then the draft is a material consideration with limited weight. Source: Ards and North Down Borough Council, Draft Plan Strategy, checked 21 November 2026.
Applying in Ards and North Down
Use the NI Planning Portal. Check the planning history first. On the peninsula and along the lough shore, earlier decisions on the same road often tell you how the council reads the countryside policies.
Fees in brief
The fees are set in Northern Ireland regulations, not by the council. From 1 April 2025: £347 per dwelling for householder work, £1,035 for a full application for one house, £515 for outline permission for one house. A certificate of lawfulness for a proposal costs half the equivalent fee. Source: Planning (Fees) (Amendment) Regulations (NI) 2025.
Local considerations
- PPS 21 still applies. New houses in the countryside need to fit one of its routes: a farm dwelling, a replacement, an infill site in a small gap, a cluster, or one of the other listed cases. Integration and rural character tests are strict on the open drumlin landscape of the Ards.
- Conservation areas. Donaghadee, Holywood and Portaferry are listed by the council. Trees in a conservation area are protected, and the council must be given six weeks’ notice before works to them.
- The Strangford and Lecale AONB. Sites along the Strangford Lough shore and the southern peninsula may sit inside it, where permitted development is narrower and landscape impact matters more.
- Coastal sites. Flood risk, coastal erosion and nature conservation designations around the lough and the Irish Sea coast can all apply.
Talking to the planners first
Pre-application discussions are worth asking for when the principle is in doubt: a rural dwelling under PPS 21, a change of use in a town centre, or new building in a conservation area. Take a site plan, photographs and the specific policy question. Major development needs a proposal of application notice and 12 weeks of community consultation first.
Towns in the borough
Bangor
Bangor’s applications are mostly extensions, dormers and conversions, judged under the regional PPSs. Bangor itself is not on DfI’s list of conservation areas, but Holywood and Donaghadee nearby are, and parts of the town may have other local designations in the area plan. Seafront and marina sites raise design and coastal questions.
Newtownards
Newtownards is the market town at the head of Strangford Lough. Town-centre changes of use and upper-floor flats are common. On the edge of the town and towards the lough, a site may be in the countryside or close to the AONB, so check the area plan map before assuming anything.
Talk to a planner about your site
NI Planning Permission Ltd works in all 11 council areas. Send us the site address and a line about what you want to do, and we will tell you which policies the council will apply and whether a pre-application discussion is worth it. The first call costs nothing. Our line for this area is 028 9132 0001, and the main office is on 028 9591 6888. Or email info@niplanningpermission.co.uk.