Which Council Decides Your Planning Application in Northern Ireland?

It sounds like a simple question, but we are asked it surprisingly often. The answer affects which plan your project is judged against, how long it is likely to take, and even which website you use to apply.

The short answer

Since 1 April 2015, Northern Ireland’s 11 district councils have been the local planning authorities. Unless your proposal falls into one of a few special categories, the council for the area where the land sits will receive, assess and decide your application. The Department for Infrastructure (DfI) sets regional policy, oversees the system and decides a small number of the most significant cases.

The 11 councils

  1. Antrim and Newtownabbey
  2. Ards and North Down
  3. Armagh City, Banbridge and Craigavon
  4. Belfast
  5. Causeway Coast and Glens
  6. Derry City and Strabane
  7. Fermanagh and Omagh
  8. Lisburn and Castlereagh
  9. Mid and East Antrim
  10. Mid Ulster
  11. Newry, Mourne and Down

Each has its own council page on this site.

Why boundaries catch people out

The councils were formed in 2015 by merging older districts, and some boundaries moved at the same time. Postal addresses, phone codes and even local loyalties do not always match the council map. A few examples:

  • Dunmurry and parts of the former Lisburn district moved into Belfast in 2015. Some older plans for those areas still matter, because the Lisburn Area Plan 2001 continues to apply there for zonings.
  • Dundonald, Carryduff and the former Castlereagh area are now in Lisburn and Castlereagh, even though many people think of them as Belfast suburbs.
  • Newtownabbey and Glengormley have a Belfast feel and a BT36 or BT37 postcode, but they are in Antrim and Newtownabbey.
  • Holywood sits in Ards and North Down, not Belfast.
  • Rural addresses near council edges can carry a postal town in one council while the land sits in another.

If the site straddles a boundary, which happens occasionally with farms and large plots, check with both councils before you submit so that the application goes to the right place and nobody is surprised later. It is also worth remembering that a farm business can operate across two councils, which matters if you are relying on a farm-dwelling policy.

When the Department decides

A small number of applications are decided by DfI rather than a council:

  • Regionally significant development, a category for the largest and most strategically important schemes, which go directly to the Department.
  • Called-in applications, where the Department uses its power to take over the decision from a council.

For homeowners, farmers and most businesses this will never arise. Even where the Department is the decision-maker, it normally seeks the views of the council for the area. Extensions, rural dwellings, farm buildings, changes of use and almost all commercial proposals are council decisions.

Major and local development

Within the council system, applications are classified as “major” or “local”. Major development, such as larger housing schemes or substantial commercial floor space, has extra requirements, including a proposal of application notice at least 12 weeks before submission and community consultation. Local development covers everything else and is what most of our work involves.

Where you submit

Ten councils use the shared NI Planning Portal for submissions, fees and tracking. Mid Ulster District Council has its own online system. The fees are the same statutory fees in every council, set by the Planning (Fees) Regulations (Northern Ireland) 2015 as amended.

Why the council matters so much

Once you know the council, you know three important things:

  1. The plan. Six councils have an adopted Plan Strategy with their own policies; five still use the regional Planning Policy Statements, including PPS 21 in the countryside. See our development plan status table.
  2. The pace. Average decision times for local applications ranged from 8.4 to 45.8 weeks between councils in April to June 2026. See council decision times.
  3. The local landscape and constraints. Areas of outstanding natural beauty, loughs, coasts and historic towns vary from council to council.

What happens after a decision

Whoever decides the application, appeals against refusals and conditions go to the Planning Appeals Commission, an independent body. Enforcement is handled by the council’s own enforcement team.

How to check your council

The simplest way is to search the address on the council’s own website or the NI Planning Portal’s public map, or to look at your rates bill. Or send us the address and we will confirm the council, the plan that applies and the policies likely to decide your proposal.