The plan that applies
The borough still relies on the Northern Area Plan 2016, adopted on 22 September 2015, together with the Strategic Planning Policy Statement and the retained Planning Policy Statements. When we checked the council’s website on 20 November 2026, no draft Plan Strategy had been published; the council’s timetable points to a draft in autumn or winter 2026. See our news item on the timetable.
The Northern Area Plan is relatively recent compared with many area plans in Northern Ireland, and it includes a detailed set of local designations. Reading it alongside the regional policies is essential.
Layers of protection
Areas of Outstanding Natural Beauty
Four AONBs touch the borough: the Causeway Coast, the Antrim Coast and Glens, Binevenagh and the Sperrins. In an AONB, PPS 2 Policy NH 6 expects development to be sympathetic to the special character of the area, in siting, scale, design and materials. Permitted development rights for houses are also narrower in these areas.
The World Heritage Site
The Giant’s Causeway and Causeway Coast World Heritage Site is protected not just within its boundary but in its setting. Proposals in the surrounding area may be assessed for their effect on views to and from the site.
Local designations
The Northern Area Plan adds its own landscape and coastal designations, which carry policies that can be stricter than the regional baseline. Check the plan maps for any designation affecting your site.
Nature conservation
Much of the coast and several rivers carry international or national nature designations. Larger proposals, and those near the shore, may need ecological information.
Coastal issues
Erosion and flooding
Parts of the coastline are dynamic, with erosion and coastal flooding a real consideration. PPS 15 deals with flood risk, and the council will be cautious about development in places exposed to coastal processes.
Seaside towns
Portrush, Portstewart, Castlerock, Ballycastle and Cushendall each have a distinctive character. In the towns, the focus shifts to design and townscape, and in some places conservation areas or areas of townscape character.
Building a house in the countryside
PPS 21 applies across the rural parts of the borough. The routes most often used are replacement dwellings under CTY 3, dwellings on farms under CTY 10, small gaps in built-up frontages under CTY 8 and clusters under CTY 2a. All must meet the integration and rural character tests in CTY 13 and CTY 14.
In an AONB or near the coast, those tests become more demanding. Open, elevated or skyline sites are especially hard to justify. Successful proposals usually:
- use existing landform and vegetation for backdrop and enclosure;
- keep the scale modest and the form simple;
- use materials and detailing that reflect local rural buildings;
- avoid extensive engineering, such as large retaining walls or long new driveways.
Holiday homes and tourism
The borough’s popularity brings proposals for holiday homes, chalets, glamping and visitor facilities. Tourism development is assessed under PPS 16, which sets out where different types of tourist accommodation may be acceptable. Using a dwelling for holiday letting may also be a material change of use depending on the circumstances.
Before you buy
Coastal and AONB sites can command high prices, sometimes on the assumption that planning permission will follow. A site appraisal before you buy can save a great deal. Check whether any previous permission has expired, which policy route the site would rely on and what the landscape designation means for the design.
Questions worth answering at the start
- Is the site inside a settlement development limit in the Northern Area Plan, or in the countryside?
- Which AONB, local landscape designation or coastal policy area covers it, if any?
- Is there a realistic PPS 21 route for a new or replacement building?
- Could the proposal be seen from the coast road, a beach, a viewpoint or the World Heritage Site?
- Is there any history of coastal erosion, flooding or land instability nearby?
- What would DfI Roads need for a safe access?
Clear answers to these questions shape everything that follows, from the design to the supporting reports.
Timescales
The council’s average processing time for local applications was 20.8 weeks in April to June 2026, according to DfI provisional figures. Sensitive sites often take longer because of consultations.