Mid Ulster Planning: Farms, Villages and the Towns Between Them

Mid Ulster is Northern Ireland's farming heartland. Between Lough Neagh and the Sperrins lie hundreds of family farms, dozens of villages and three main towns, Magherafelt, Cookstown and Dungannon. Planning applications here reflect that mix, and the council does some things differently from everyone else.

Two things that set Mid Ulster apart

Its own online system

Ten of Northern Ireland’s eleven councils use the shared NI Planning Portal. Mid Ulster does not. Applications, plans and comments are handled through the council’s own online planning service. The statutory fees are the same, but if you are used to the Portal, expect a different interface for searching history and submitting an application.

A draft plan that is still some way from adoption

Mid Ulster published its draft Plan Strategy in February 2019 and submitted it for independent examination in May 2021. On 27 August 2026, the Department for Infrastructure issued a direction requiring the council to modify the plan before it can be adopted. Until it is, decisions follow the Strategic Planning Policy Statement, the retained Planning Policy Statements and three area plans: the Cookstown Area Plan 2010, the Dungannon and South Tyrone Area Plan 2010 and the Magherafelt Area Plan 2015. Our news item on the direction has more detail.

Farms: homes and buildings

A dwelling on the farm

PPS 21 Policy CTY 10 allows a dwelling on a farm where the farm business is currently active and has been established for at least six years, no dwellings or development opportunities have been sold off from the holding in the ten years before the application, and the new house is visually linked or sited to cluster with an established group of buildings on the farm. Evidence of the business, such as a DAERA business ID and records of farming activity, is central to the case.

The integration and rural character tests in CTY 13 and CTY 14 still apply, so the exact siting matters as much as the farm credentials.

Agricultural buildings

Many farm buildings can be built under permitted development, within the limits of Part 7 of the Planning (General Permitted Development) Order (Northern Ireland) 2015. Among other conditions, the farm unit must be at least 0.5 hectares, the building must not be the first on the unit, it must be within 75 metres of the main farm group, it must not be within 75 metres of a neighbour’s home, and the ground area must not exceed 500 square metres. Buildings outside those limits need an application, assessed under PPS 21 Policy CTY 12.

Livestock and emissions

Larger livestock buildings, slurry stores and similar development can raise questions of odour and ammonia, with the Northern Ireland Environment Agency often consulted. These proposals need careful preparation, and the supporting information can be substantial.

Diversification

Farm diversification, from a farm shop to a workshop in a redundant building, is considered under PPS 21 and PPS 4. Re-using existing buildings tends to be the strongest approach.

Villages: infill and clusters

Mid Ulster’s villages are a mix of designated settlements, with limits drawn in the area plans, and smaller groups of buildings in the countryside.

  • Inside a settlement limit, new houses are judged mainly against PPS 7 and the character of the village.
  • Outside, the countryside policies apply. A small gap site in an otherwise substantial and continuously built-up frontage may qualify under CTY 8; a site within an existing cluster may qualify under CTY 2a.

Finding a site on the area plan map, and knowing which of the three area plans covers it, is always the first step.

Towns: extensions and changes of use

In Magherafelt, Cookstown, Dungannon and Coalisland, the most common applications are extensions and alterations to houses, assessed under the PPS 7 addendum on residential extensions, and changes of use in the town centres. Check permitted development first: many single-storey rear extensions do not need permission.

Access onto rural roads

Almost every rural application in the district needs a safe access, and that often means visibility splays across land in front of the site. If the splays need hedges removed or cross a neighbour’s land, sort it out before the application goes in. DfI Roads is consulted on access, and a problem here is one of the most common reasons rural applications stall.

Timescales

In April to June 2026 Mid Ulster’s average processing time for local applications was 18.0 weeks, according to DfI provisional figures. That is slightly better than the Northern Ireland average of 20.0 weeks.

Related pages

For a view on a Mid Ulster site, call 028 7912 0001.

Your first call costs nothing

Give us the site address and a line about the project. We will tell you which council and which plan will decide it, and what the realistic route looks like. Call 028 9591 6888, email info@niplanningpermission.co.uk, or use the contact form.

Call now028 9591 6888 Emailinfo@ Free advicecontact form